Grundstück verkaufen Bonn: Ablauf, Steuern, Unterlagen - Tipps

Land-use plan

Real Estate AI
100% GDPR
Try now

The land-use plan of a plot of land determines whether your buildable land will become a villa, an apartment building, or just a garden house. It legally regulates the number of floors, roof type, floor area ratio (FAR), and type of use — and can change the market value of a plot by 30% to 200%. Anyone who buys, builds, or sells must be able to read the B-Plan like a balance sheet: between the lines, it states what is actually allowed.

What is a land-use plan — and what legal force does it have?

The land-use plan (shortened to B-Plan) is a municipal ordinance with the force of law according to § 8 of the Building Code. It is decided by the municipal council, publicly displayed, and binds every landowner. In contrast to the land-use plan (FNP), which only provides a rough direction, the B-Plan is precise and directly legally binding.

  • Qualified B-Plan — type, size, construction method, and areas fully regulated
  • Simple B-Plan — only partial regulations, remainder according to § 34 of the Building Code
  • Project-related B-Plan — tailored to a specific project
  • § 34 Inner Area — Development according to surroundings, no B-Plan
  • § 35 Outer Area — building generally not allowed
✓ 100% DSGVO✓ Server in DeutschlandSommer-Deal – jetzt sparenJetzt Lukinski AI entdecken100% DSGVO für deine Firma – Kaufpreise, Mietrecht, Bodenrichtwerte in Sekunden statt Stunden Recherche.Frag z.B.: „Ist diese Mietvertragsklausel wirksam?“Jetzt kostenlos testen →

Reading the most important regulations: GRZ, GFZ, Building Window

The B-Plan of a plot consists of a graphical representation (plan symbols according to PlanzV) and a textual part. Anyone evaluating a plot must understand four key figures — they determine the buildable volume and thus every serious property valuation calculation.

Figure Meaning Example 800 m² plot
GRZ (Ground Area Factor) Share of buildable area 0.4 = 320 m² buildable
GFZ (Floor Area Factor) Total floor area 0.8 = 640 m² living area
BMZ (Building Volume Factor) Volume in m³/m² only relevant for commercial use
Full Floors Maximum number of floors II = ground floor + 1st floor

Important: According to § 19 para. 4 of the Building Code, the floor area ratio (GRZ) may be exceeded by 50% — for garages, driveways, terraces. From a GRZ of 0.4, effectively 0.6 sealable area results. Many buyers overlook this.

[crp limit="2"]

Viewing the zoning plan: Where, how, free of charge?

The zoning plan (B-Plan) is public — you need neither proof of ownership nor a real estate agent’s mandate. Three ways lead to the goal, ideally before notarization (see Calculate notary fees):

  1. Online geoportal — almost all cities with more than 20,000 inhabitants have digital B-Plan portals (e.g. FB Bauen, GeoPortal NRW)
  2. Municipal building authority — free access, copies cost 5–25 €
  3. Building inquiry (§ 34 Building Code) — binding information, 100–500 € depending on the federal state

What is NOT included in the zoning plan? The 5 typical pitfalls

Even a qualified zoning plan does not regulate everything. Anyone who only reads the plan may overlook risks that can reduce the price of a property purchase by six-figure sums — or even cause the building project to fail.

  • Legacy issues — obtain a separate soil assessment
  • Monument protection — check the municipality’s monument list
  • Development contributions — up to 90 % of the adjacent costs possible
  • Land use restrictions — right of way, setback areas, only in the land use register
  • Neighbourhood law — boundary distances according to LBO, not according to the B-Plan

Practical tip: Always request the land use register AND the land register extract at the same time. The B-Plan shows what the municipality wants — the land register shows what third parties are allowed to do.

Development plan and plot value: The leverage effect

A plot without a B-plan in the outer area costs 5–40 €/m². The same area with a B-plan and GFZ 1.2 can reach 600–2,500 €/m² — in top locations like Munich-Bogenhausen or Hamburg-Blankenese even over 4,000 €/m². The pure act of plan approval is the biggest value creation in the German real estate market. As described in the guide Sell plot, you should check before every sale whether an ongoing B-plan procedure temporarily increases the value — often waiting is worthwhile.

Change, exemption, exception — when the B-plan doesn’t fit

The B-plan of a plot is not set in stone. Three instruments allow deviations, each with its own legal basis and probability of success:

Instrument Legal basis Duraction Success rate
Exemption § 31 para. 2 BauGB 2–6 months 40–60 %
Exception § 31 para. 1 BauGB 1–3 months 70–85 %
B-Plan amendment § 13 / § 13a BauGB 12–36 months 30–50 %

An exemption usually fails due to the “touching of the core principles of planning” — anyone wanting to enforce a second full floor, although the entire development plan is designed for I+D, has no chance. Realistic deviations are possible regarding roof pitch, roof orientation or shifting building windows by a few meters.

Development plan when buying real estate: The checklist

Before every purchase — whether building land, existing property or investment property — the B-plan check belongs in the due diligence. It is free, takes 30 minutes and prevents the most expensive mistakes. Combine the inspection with the calculate purchase ancillary costs calculation and the calculate equity requirement.

  • Plan number — inquire at the building authority
  • Usage type — check WA, WR, MI, GE
  • GRZ/GFZ — reserves for extension/raising?
  • Building window — is the location of the house permissible?
  • Preservation ordinance — is neighborhood protection active?
  • Rehabilitation area — approval required under § 144 of the Building Code

Especially when buying your first property, the B-plan is often ignored — an error that becomes painful at the very latest during the first renovation or when adding an extension. Anyone who starts investing by buying an apartment building must check whether raising or extending the top floor according to the B-plan is even permissible — this determines the net yield calculation forecast over 10 years.

What does it cost to view the development plan?

The pure insight at the building authority is always free of charge, as stipulated by § 10 para. 3 BauGB. Certified extracts or copies cost between 5 and 25 euros per sheet, depending on the municipality. A binding building inquiry under § 34 BauGB ranges between 100 and 500 euros, sometimes higher in big cities. Online portals of many cities now offer the plan as a free PDF download, which greatly simplifies the review before a purchase decision.

Can I challenge a land use plan?

Yes, the norm control procedure under § 47 VwGO allows any affected party to challenge a B-plan within one year of its announcement at the higher administrative court. Success prospects are particularly high in cases of weighing errors, incorrect participation or violation of higher-ranking planning law. The procedure duration is 12 to 36 months, and legal costs range between 5,000 and 15,000 euros for moderate dispute values — for private individuals, this is only worthwhile in cases of significant reduction in the value of their own property.

What happens without a land use plan?

If a plot is located in the inner area without a B-plan, § 34 of the Building Code applies: development must conform in type and extent to the character of the immediate surroundings. In the outer area, according to § 35 of the Building Code, only privileged projects such as agriculture, forestry, or energy installations are permitted — residential construction is practically excluded. Exactly this boundary determines whether a field is traded for 8 euros per square meter or developed as buildable land for 200 times that amount. A preliminary building inquiry creates binding clarity here.

Back to the Wiki: Real Estate Lexicon