Tag Archive for: stove

GmbH & Co KG - Gründung, Geschäftsführung, Haftung & Co

GmbH & Co KG – Foundation, Management, Liability & Co

GmbH & Co KG – The GmbH & Co KG is a German legal form which combines the corporate legal form of the limited partnership (KG) with a limited liability company (GmbH). Thus, the greatest advantages of both legal forms – the separation between general partner & capital provider typical for the KG plus the […]

监事会--公共有限公司(AG)的控制机构

Limited liability company (GmbH) – formation, liability, legal form, management, taxes

Limited Liability Company (Gesellschaft mit beschränkter Haftung, GmbH) – The limited liability company is a German legal form that is founded by at least one person and managed by at least one shareholder. As the name already indicates, this corporate legal form is characterized by a limitation of liability for its shareholder(s). The GmbH is […]

供暖:太阳能、石油、天然气、热泵、颗粒燃料--比较、成本和国家补贴

Heating: Solar, Oil, Gas, Heat Pump, Pellets – Comparison, Costs & State Subsidies

Heating & Types – The topic heating is not only interesting for building owners, but also for real estate owners. Heaters are not only necessary in a real estate, but also legally required. Which types of heating are there, how do they have to be maintained and are there legal subsidies for the construction of […]

Craftsman radar: find professionals near you - house, apartment, real estate

Power connection – Laying three-phase alternating current, stove & costs

Power connection – A power connection refers to a power connection of at least 400 volts. This is usually found in a kitchen or garage and is used to connect appliances with a high current load, such as an oven, stove or sauna. Heavy current is actually called three-phase alternating current because of the three […]

Grundstück verkaufen: Ablauf, Baurecht, Immobilienmakler, Notar, Kosten & Steuern

HOAI – Fee Structure for Architects and Engineers

The Fee Regulations for Architects and Engineers set out the framework for the remuneration of architects and engineers for planning in the field of civil engineering, architecture and urban planning. The fee is made up of 4 different factors. The construction costs, the fee rate, the degree of difficulty of the project divided into 5 […]